- Inspection
Operating Logic Test (Manual only)
Inspect the PTC operation by confirmation logic as follows.
-
Entering
-
Set the Floor mode and maximum heating position.
-
Turn off the blower switch.
-
Press the intake (recirculation) button 5 times or more.
-
\Indicators of intake and A/C button are continuously flashed with an interval of 0.5 seconds.
-
Confirm the PTC operation by turn on the blower switch.
-
Each PTC relay is operated with an interval of 3 seconds.
-
The logic test will be automatically cancelled after 30 seconds.In addition, it can be cancelled by followings.
-
Select A/C or intake (recirculation) switch
-
Ignition switch OFF
-
-
-
Cancellation
-
Select A/C or intake (recirculation) switch.
-
Turn the ignition switch OFF.
-
The test is cancelled automatically after 30 seconds.
-
-
If the PTC is not operated, substitute with a known-good PTC heater and check for proper operation.If the problem is corrected, replace the PTC heater.
Operating Test
This test should be performed in the PTC ON conditions.
-
Run the engine.
-
Check the current on wiring with a clamp multi tester.
Pattern Current (A) PTC 1 ON 0.1 - 33 PTC 2 ON 0.1 - 33 PTC 3 ON 0.1 - 33 Total 0.1 - 100
-
If the current is not specification, inspect related wiring.
Resistance Test
-
Turn the ignition switch OFF.
-
Disconnect the PTC heater connector.
-
Measure the resistance between terminal 1, 2, 3 of PTC heater and ground line.
Resistance : 0.3 - 1.5 Ω
-
PTC 1
-
PTC 2
-
PTC 3
-
-
If the measured resistance is not specification, replace the PTC heater with new one.
- Replacement
-
Disconnect the negative (-) battery terminal.
-
Remove the floor console side cover.
-
Disconnect the PTC heater connector (A).
-
Remove the PTC heater core (A) after loosening the PTC heater mounting screws.
-
To install, reverse the removal procedure.